-
Every described screen reads the bag it means
-
The problems inbox is described
-
A monthly goal's button names the move it makes
-
The monthly review is described
-
The email body column says which of its two formats it holds
-
The snooze picker names the seventh finding: no date kind exists
-
The mail list and the thread are described
-
Take the current makeover suite: build 0.14.1, webview 0.22.1, geometry 0.7
-
Delete the day-detail panel, which never had a container to render into
-
got says whether a task is available
-
Take the raised surface from layout.css instead of hand-rolling it
-
Unwedge the lockfile: makeover-webview 0.21.0 could not resolve
-
Retire the task-to-problem migration plan, its migration done
-
Settings is described, as far as the host lets it be
-
The weekly review is described rather than built
-
Every task surface says whether the task is available
-
Say three described screens, since tasks landed
-
A day plan unlocks the work it makes possible
-
The dashboard, the README and the changelog catch up with dependencies
-
Tasks can block each other, and blocked work stops reading as available
-
The attachments column picks a file, and opens one
-
Take makeover 0.12: empty states are stand-ins, and deletes ask first
-
Take makeover 0.11: streak figures are a strip, row progress is a bar
-
The task screen renders markdown and its subtask ticks are the write
-
The projects form re-offers a refused submission
-
Deleting a task redirects and says so, instead of a tombstone
-
Lock the published makeover 0.10 cascade
-
Draw the two proportions the task overview was only counting
-
Describe the project dashboard through quasi
-
Describe the task overview through quasi